    Hubei Energy Storage Station

    PROJECT WINS

    ☑️EMS system adopts a master/slave structure to achieve a unique project response in the power grid

    ▸90MW/180MWh
    ▸Ancillary services
    ▸Peak shaving
    ▸Grid stability & reliability

    Project Introduction:

    The project covers an area of 10643.4 square meters and has a total capacity of 90MW/180MWh, divided into two sections for construction. The first section adopts 30-unit of 3.34MWh DC containers and 16 boost inverter integrated cabins, while the second section adopts 12-unit of 3.35MW/6.7MWh energy storage systems with lithium-ion battery packs. A 220kV booster station has been constructed, which is connected to the 220kV side of the Xiangbei Wind Farm booster station via a single 220kV transmission line. By means of providing energy storage system for new energy power plants, the project realizes peak power regulation and response for demand side, which is crucial for ensuring the smooth operation of the power grid. It effectively enhances the peak shaving capability of the regional power grid and possesses primary frequency regulation capability, which not only improves quality of local power supply, but also solves problems such as new energy consumption and regional power shortage.


    Contact Information

    Prefer to solve all your questions together soon? We protect your privacy and respond within 24 hours.